Details: dismantling & transportation of 1000 mm drive head (double drive drum) with loop take up and all accessories (like as motor, gear box, drive drum, girders, frame, chute & side plate etc) up to lead of 100m up to track end in ug transportation of 1000/800 mm size double drive head with loop take up in ug up to lead of 100m at chp-1 mine of pkd area. installation of 1000/800mm size double drive head with loop take up in ug, at chp-1 mine of pkd area. excavation of foundation in hard rock (blasting prohibited), trencher of drain not exceeding 1.5 m in width are 10 sq. mtr. on plan including dressing of sides & ramming of bottoms lift up to 1.5 m including getting out excavated rock & disposal of same plane at excavated site as per directed within lead of 100 m. providing, transportation and laying in position cement concrete 1:2.4(1 cement:2 coarse sand: 4 graded stone aggregate 20mm nominal size) (as per 4.1.3 of dsr-2021) transportation of 800mm/1000mm size belt structu
Sector: Mining