Details: item description/ headingpart (a) labour cost dismentling steel work in built up sections in angles,tees flats and channels including all gusset plates,bolts, nuts cutting rivets. welding etc, including dismembering and stacking within50 metres lead labour rate for structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting fixing in positon and applyin a priming coat of approved steel primer all complete carrieage of materials by mechanical transport including loading, unlaoading and stacking deilling, blasting and mucking manually in stone ( drilling by power drill) roof bolting in ug by hiring of dgms approved portable hydraulic roof bolting machine with wet drilling arrangement (1.50m-1.80m length with 27mm dia , drill bit for anchoring 20/22mm dia roof bolts with resin capsules and fitting of bearing plates and w-strap ( as and when reuqired) and tightening of nuts etc complet
Sector: Mining