Details: excavation in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m depth for foundation, etc., and getting out in any type of soil complete all as specified and directed. excavation in trenches, not exceeding 1.5 m wide and exceeding 1.5m but not exceeding 3 m depth for foundation, etc., and getting out in any type of soil complete all as specified and directed. excavation over area not exceeding 1.5 m in depth and getting out in any type of soil complete all as specified and directed. excavation over area exc. 1.5m but not exceeding 3.0 m in depth and getting out in any type of soil complete all as specified and directed. excavation over area exc. 3.0 m but not exceeding 4.5 m in depth and getting out in any type of soil complete all as specified and directed. returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick in any type of soil complete all as specified and directed. removing excavated soils not exceeding 50 m a
Sector: Defense