Details: excavation in trenches, n. exc 1.5 mtr wide and n. exc 1.5 mtr in depth for foundation/laying of cable and getting out in soft/loose soil complete all as specified and directed. returning, filling in including spreading, levelling, watering and well ramming in layers n. exc 25 cm thick complete all as specified and directed. removing of excavated soil to a distance n. exc 50 mtr and depositing where directed at a level n. exc 1.5 mtr above the starting point complete all as specified and directed. supply & spread unwashed dry river sand for sand cushioning for covering the under ground cable in trenchescomplete all as specified and directed.note :- punning thickness shall be measured. m&l for cable protection cover with sub class`b` bricks old size laid dry, flat perpendicular across the cable in trenches complete all as specified and directed. supply, laying and commissioning xlpe insulated screened, pvc bedded galvanised steel or wire armoured electric power cables (heavy duty
Sector: Defense