Details: excavation in trenches not exceeding 1.5m width and not exceeding 1.5m depth and getting out for laying of pipe etc in hard/dense soil complete all as specified and directed by engr-in-charge. returning, filling including spreading, levelling, watering and well ramming in layers not exceeding 25cm in hard/dense soil complete all as specified and directed by engr-in-charge. removing excavated surplus in hard/dense soil to a distance not exceeding 50m and depositing where directed and at a level not exceeding 1.5m above the starting point complete all as specified and directed by engr-in-charge. material & labour for pcc 1: 3: 6 type c1, using 20mm graded crushed trap stone aggregate & grouting in cement mortar 1:4 for making good road cutting complete all as specified and directed by engr-in-charge. taking up or down old unserviceable gi pipe lines alongwith fittings from existing connections of size 100 mm nominal bore complete all as specified and directed. all as per item no. 05 a
Sector: Defense