Details: excavating in trenches n. exc 1.5m wide and n. exc 1.5m in depth for foundation/ pipes/ cable etc, n. exc 10sqm on plan and n.exc 1.5m in depth and getting out in hard/dense soil complete all as specified and directed. returning, filling in, including spreading, leveling, watering and well ramming in layers not exc 25cm thick, in soil complete all as specified and directed. removing of excavated surplus soils, n.exc 50m and depositing where directed at a level n.exc 1.5m above the starting point complete all as specified and directed. material & labour for sand cushioning for pvc/xlpe cable with screened and washed sand and punning to provided a required covers all as specified and directed. supply and laying reinforced precast concrete cable cover, class lv, type 2 flat, size 300mm x 180mm x 40mm material & labour for double wall corrugated hdpe pipe, heavey duty for laying of electric cables cross-sectional area 80mm dia complete all as specified & directed. supply and laying
Sector: Defense