Description: PROVN OF NEW JCOs LIVING FOR 04 X JCOs ALONGWITH TOILET BATHROOM WITH GEYSERS AT GE FDK MIL STN Name of Work PROVN OF NEW JCOs LIVING FOR 04 X JCOs ALONGWITH TOILET BATHROOM WITH GEYSERS AT GE FDK MIL STN
Details: Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 Sqm on plan and n. exc 1.5 m in depth and getting out in soft/ loose soil complete all as specified and directed. Excavating over areas n exc 1.5 m in depth and getting out in soft/ loose soil complete all as specified and directed. M&L PCC 1:4:8, type D2, (using 40mm graded stone aggregate) as in foundation, filling and mass concrete complete all as specified and directed. M&L RCC M-30 (20mm graded stone aggregate) as in Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and directed. M&L RCC M-30 (20mm graded stone aggregate) as in Columns, pillars, piers, posts and struts complete all as specified and directed. M&L RCC M-30 (20mm graded stone aggregate) as in Beams, cantilevers, bressummers, lintels over 1.
Sector: Defense