Details: dismantling and taking out water pump fan motor and water distribution pipes from the desert cooler carrying out minor repair to set the damaged/bent up parts by means of hammering/welding/riveting as required removing existing paint/treatment from the desert cooler completely and preparing the surface and applying externally one coat of synthetic enamel spray paint over a coat of red oxide primer(shutters shall be painted all round i.e. externally internally with one coat of synthetic enamel spray paint over a coat of red oxide primer) and fixing 14 swg wire mesh for fixing the pads to shutters rearranging the pads and refixing motor pump pvc pipe distributor and sutters in existing positions complete all as specified and directed by engr-in-charge. dismantling cutting and removing of old burnt windings and rewinding of fan motor of desert cooler with super enamelled copper winding wire of required size including allied insulation materials varnish sleeves etc. greasing oiling re-as
Sector: Defense