Description: Construction of Switch and Meter Room for 33 K V H T Power connection from CESC at Paikpara Depot Name of Work Construction of Switch Meter Room for 33 K V H T Power connection from CESC at Paikpara Depot
Details: Dismantling all types of plain cement concrete works and removing as directed within a lead of 75 m In ground floor including roof upto 150 mm. Thick Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing as directed within a lead of 75 m. In ground floor including roof Dismantling R.C. floor, roof, beams etc. including cutting rods and removing as directed within a lead of 75 m. including stacking of steel bars. In ground floor including roof. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. Single Brick Flat Soling of picked jhama bricks incl
Sector: Transport Dept