Details: sch a part -i (internal road near bldg no. a/8/13 of ad wksp under ge panagarh) scarifying or picking gravelled macadam or bituminous macadam surfaces in area n. exc 400 sqm and depth exc 50 mm but not exceeding 100 mm deep by mechanical means using of ripper/ rotavator/ hydraulic excavator (scarifying include over and grading the broken up surface to the proper camber etc. as required) & rolling & consolidating of existing broken boulder or quarried stone with power roller exceeding 8.00 tonne & not exceeding 12.00 tonne capacity to required gradient and camber, complete all as specified and directed.[note : total qty : 84.00 (part-i) + 330.00 (part-ii) + 135 (part-iii) = 549.00] m&l, laying and compacting total 150mm compacted thickness (laid in two layers of 75mm each) wet mix macadam (wmm) grading as per table 400-12 & 400-13 of morth specifications for road and bridge works 2013 manufactured in wmm plant, material comprising of clean, crushed, graded aggregate and granular materia
Sector: Defense