Details: sch a, part-i [truf surface (land development)] forming embankments including raising (or lowring) earth, spreading in layers not exceeding 30 cm thick ,watering, ramming /rolling and finishing to required size, shape, etc not exceeding 1.5m high from base in soils complete all as specified and directed.[note no 1: provision of fine good earth free from stone/pebbles and foreign material (obtained from outside mod land shall be measured and paid separately).2: compaction of earth filling shall be carried out under optimum moisture conditions so as to obtain standerd proctor denisity not less than 95% . for payment purpose, volume of filling after deduction 10% shall be considered.3. the contractor shall have take initial measuremnts at his/their own cost in presance of engr-in-charge before starting the work and submit final measurements after filled earth/soils.] bringing earth from outside mod land and depositing where directed at a level upto 1.5m from ground complete all as specif
Sector: Defense