Description: Dismantling of HT and LT line at Patherdih Coal Washery Township Name of Work Dismantling of HT and LT line at Patherdih Coal Washery Township
Details: Item Description/ Heading (1). Supply and of AB Switch: 01 set @ Rs. 28000/- = Rs. 28000/- (2). Supply & of Lighting arrester: 01 set @ Rs. 5462.22/- = Rs. 5462.22 /- Total = Rs. 33462.22/- (3). Supply and of 11kV Horn Gap Fuse: 01 set @ Rs. 7050/- = Rs. 7050.00 /- (4). Supply and of chemical earth pit: 02 Nos @ Rs. 15000.00/- = Rs. 30000.00 /- Total = Rs. 37050.00/- (5). Installation and commissioning of Power Transformer 11kV/440V, 250 kVA with complete fittings: 1 set @ Rs. 15000.00/- = Rs. 15000.00/- (6). Dismantling of OH Line comprising aluminum overhead conductor, cross arms, insulator etc: 5692 Kg @ Rs. 24.90/- = Rs. 141791.14 /- Total = Rs. 156787.79/- (7). Dismantling of Rail Pole etc : 20 nos @ Rs. 778.12/- = Rs. 15562.33 Total = Rs.48082.80 /- Total impact of GST for the purpose of CTC
Sector: Mining