Details: item description/ heading dismantlling of vertical pipe range consisting of 6" m.s. pipe from riv seam to s surface top. dismntling of delivery line consisting of 6" m.s. pipe and valves from pump to higwall s in riv seam transporting, diversion of 6" m.s.pipe range from higwall to pump from east side s to west side installation of vertical pipe range consisting of 6" pipe line from riv seam through highwall to surface transportation of 300m. 8" hdpe pipe from sodepur central to working site at unit laying and installation of 200m, 8" hdpe pipe range from higwal top mouth to surface reservoir. dismantling and transportation of breakdown pump motor, pump and bed plate from riv seam to unit workshop for repairing fabrication of bed plate and aligning the same with spare motor at unit workshop transportation of complete pump, motor, bed plate etc and installation of the same at pump foundation, connecting suction and delivery range total impact of gst for the purpose of ctc
Sector: Mining