Details: item description/ heading collection of trolley from ug pit bottom and loading of pump at surface and lowering through shaft transportation of pump from pit bottom to pump section (haulage and manually) dismantling of existing pump and loading on tralley and transportation up to surface installation of repaired pump including delivery line, suction line, nr valve, foot valve etc. transportation of 6" inch pipe 14 nos. from surface and installation of the same in delivery range including lowering from surface to pit bottom total impact of gst for the purpose of ctc
Sector: Mining