Details: clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (specific permission of engineer-in-charge prior to execution will be necessary). (payment to be made on area cleared) annual area dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing as directed within a lead of 75 m.a) in ground floor including roof.. dismantling r.c. floor, roof, beams etc. includingcutting rods and removing as directedwithin a lead of 75 m. including stacking of steelbars.(a) in ground floor including roof earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding late
Sector: Livestock