Details: displaced yoke and gangway rollers placed in position w.r.t. the yoke roller table. all the mooring chains of sarenga jetty pontoon are to be adjusted w.r.t. the gangway & linkway including transportation of necessary tools, tackles and manpower at site. damaged wooden planks of saranga jetty gangway to be replaced by new malaysian sal wood with necessary fasteners. entire gangway to be chipped, cleaned & painted by one coat primer & two coat anticorrosive aluminium paint. external hull alongwith deck fittings of the pontoon to be painted by 01 (one) coat zn – chromate primer & 01 (one) coat bituminous black paint. interior surface alongwith inside frame work of the pontoon to be painted by 01 (one) coat zn – chromate primer.
Sector: Transport Dept