Details: excavation in trenches in hard/ dense soil n exc 1.5 m wide and n exc 1.5 m deep and getting out, required to repair the leakage of ci pipes & fittings,including demolition of pcc/road cutting and making good to match the existing surface after repair works complete all as specified and directed taking down old unserviceable gi/ci pipe at in any position for repairs all as directed for 25 mm bore size pipes/fitings complete all as specified and directed. ditto all as per item no. 2.00 above but 32mm bore ditto all as per item no. 2.00 above but 40mm bore ditto all as per item no. 2.00 above but 50mm bore ditto all as per item no. 2.00 above but 80mm bore ditto all as per item no. 2.00 above but 100mm bore ditto all as per item no. 2.00 above but 150mm bore supplying and laying of cpvc pipe sdr 11 & plain cpvc sdr 11 of 25mm outer dia of of pipe including fittings such as bends, tees, elbows, short pieces, connectors, back nuts and connections fixed in new or old position in trenches
Sector: Defense