Details: checking/testing of earth resistance value of earthing pits installed inside darjipura, makarpura, harni camp and harni airfield area as required basis as directed by engr in charge or as scheduled and making the damaged earthing serviceable by pouring salted water into earthing or making continuity by gi strips and bringing down the resistance value within specified limits. including maintenance of existing earthing by cleaning the earth chamber funnel and cleaning of vegetation surrounding earthing pit up to 2 metres.note: (i) the entire station will be divided into two zones as per earthing location and the contractor shall deploy separate team for each zone to test the resistance value of earthings in each zone to complete the process within one month. the entire process will be repeated after every three months upto completion of the contract. (ii) one earthing testing in one season is measured as one job.(iii) digital earth tester will be arranged by the contractor on his own.
Sector: Defense