Description: Improvement of DTC Rajghat Depot I by Providing and Laying Cement Concrete interlocking paver block and other allied miscellaneous work Sub Head Providing and Laying Cement Concrete interlocking paver block Balanced Portion Name of Work Improvement of DTC Rajghat Depot I by Providing and Laying Cement Concrete interlocking paver block and other allied miscellaneous work Sub Head Providing and Laying Cement Concrete interlocking paver block Balanced Portion
Details: Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : a)bituminous road Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.A)Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.A)All kinds of soil. Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as
Sector: Transport Dept