Details: excavation in trenches in soft/loose soil not exceeding 1.50 mtrs wide and not exc. 1.5 mtr deep and getting out for taking out/laying cable, poles & stay etc complete all as specified and as directed. returning, filling in including spreading, leveling, watering and well ramming in layers not exc 25 cm thick after the cable have been laid, tested complete all as specified and as directed. removal of excavated surplus soil to a distance not exc. 50 mtrs and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and as directed. m&l for sand cushioning to under ground cable provided with layer of sand (8cm deep before laying the cable and 15 cm deep after laying the cable ie total 23 cm) complete all as specified and as directed. m&l for brick laid in trenches for cable protection of burnt clay sub class ‘b’ complete laid dry flat complete all as specified and as directed. taking out old unserviceable lt under ground cable any type from t
Sector: Defense