Details: dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc. removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete dismantling stone masonry in lime or cement mortar including stacking the materils as directed with all leads, lifts etc. as directed by engineer in charge. excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring a
Sector: University