Details: excavation in trenches not exc 1.5m in width and not exc 1.5 in depth for foundation and getting out in any type soil including pipe lines all as per item no. 1.00 above but depth exe 1.5 mtr and not exe.3 mtr excavation over area not exc 1.5 mtr deep and getting out hard/dence soil comple all as specified. returning, filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm in soil. removing excavated materials to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point demoletion of reinforced cement concerte as in cover slabs of manholes or septic tanks, soak pits etc. complete all as directed demolition of brick work built in cement mortar (including coping) demolition and breaking up 300mm dia drain pipes of rcc or salt glazed ware set in cm all as per item no. 8.00 above but size of 200mm dia. all as per item no. 8.00 above but size of 150mm dia. demolition of cement concrete of