Details: dessilting and cleaning/removal of mud/muck, sludge silt and garbage of drain including excavation if required and disposal of the same upto 50 mtr. and lift upto 1.5 mtr. including cost of all tools and plants, labour etc. as per instruction of engineer-in-charge. carriage of materials by mechanical transport including loading. unloading and stacking earth lead upto 1.00 km de-silting and cleaning/removal of mud/muck, sludge, silt and garbage of drain as when required in monsoon including excavation by 3d excavator /jcb & disposal of the same up to 50m including the cost of tools & plants, labour etc complete as per instructions of engineer-in-charge. total impact of gst for the purpose of ctc
Sector: Mining