Details: distribution of drinking water with mobile water tanker of capacity 4 kl to 6 kl. with arrangement of outlet pipe for filling of water by local residents/water treatment plant (g.s.a) including driver and fuel at desired location as per instruction of engineer in charge etc complete. (note no extra payment shall be entertained for capacity more than specified capacity) total impact of gst for the purpose of ctc
Sector: Mining