Details: disconnecting existing incoming and outgoing cables/sub main cables from feeder pillar after taking proper power shut down and exercising all safety precautions for human safety, reconnecting the all connections to new lt fp / panel complete with its accessories including finding out all its outgoing and making of name plate of its load on mccb complete all as specified and directed.note : this job is done only on sunday or holiday or after office hours with limited time of bn 01 & 02. busbar box/cables for temporary connections shall be provided by contractor at his own cost to avoid long time shutdown for fixing of new panels, pcc work, etc and after installation of new panels same will be removed. supply and laying in replacement including testing and commissioning lt ug power cable, xlpe insulated, screened, pvc bedded, galvanized steel or wire armoured, electric power cables (heavy duty) 1100 volts grade with multi-stranded aluminium conductor including termination with lt pan
Sector: Defense