Details: demolition of unreinforced cement concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) removing building material to the distance 1km from the site. excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in hard / dence soil. removing excavated material upto 50m and depositing where directed m & l for soling (or sub base) with broken boulders or quarried stone, interstices filled surface, formed, rolled & consolidated to required gradient & camber including watering & ramming etc. complete. spread thickness 150mm m & l for moorum/red bajri filling in pavings, laid in layers n. exc 15cm thick. spread, levelled & rommed including watering, etc complete fair finished formwork to sides of concrete foundations, footings, base of columns, raft and raft beams, sides and soffits (if any) of foundation
Sector: Defense