Details: hacking of cc flooring including cleaning for surface etc. complete as per direction of the engineer-in-charge davangere;hacking of cc flooring including cleaning for surface etc. complete as per direction of the engineer-in-charge harihara;hacking of cc flooring including cleaning for surface etc. complete as per direction of the engineer-in-charge mallebennur/jagalur;providing speed breakers/raised pedestrian crossings in trapezoidal section with 2.5 m top width and transition length of 0.8 m length and height of 0.1 m as per irc 99:2018 using bituminous macadam (bm) gr ii and semi dense bituminous macadam (sdbc) gr ii for entire formation width & wbm gr ii for shoulder portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 nos. retro reflective traffic signs as per irc 67 -2022 two lane for formation width of 9.00 m davangere;providing speed breakers/raised pedestrian cro
Sector: Transport Dept