Details: surface excavation not exceeding 30 cm and averaging 15 cm deep and getting out in hard/dense soil, complete all as specified & directed. material & labour for excavation in trenches, not exceeding 1.5m wide and not exceeding 1.5m in depth in hard/dense soil. for foundation, etc, or for shafts , wells cesspits, manholes, pier holes, complete all as specified & directed. material & labour for excavating over areas, not exceeding 1.5 m deep and getting out,in hard dense soil, complete all as specified & directed. returning, filling in including spreading, levelling, watering & well ramming in layers not exceeding 25 cm thick in any type of soil, complete all as specified & directed. removing surplus excavated soil to a distance not exceeding 50 mtrs and depositing where directed at a level not exceeding 1.50 mtrs above the starting point complete all as specified & directed. material & labour for riddled earth filling in trenches above and below the cable as in cable protection, co
Sector: Defense