Details: excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth and getting out in soft/loose soil for laying of under ground cable and foundation of poles.etc complete as specified and as directed. excavation in trenches not exceeding 1.5m wide and beyond 1.5m in depth and getting out in soft/loose soil for laying of under ground cable and foundation of poles.etc complete as specified and as directed. returning filling in including spreading, leveling watering and well ramming in layers not exceeding 25 cm thick .etc complete as specified and as directed. removal of excavated surplus soil not exceeding 50 m and depositing where directed at al level not exceeding 1.5 m above the starting point complete as specified and as directed. supply and spreading clean dry sand in trenches/ substation yard for cushioning all as specified for cable protection in trenches / ducts complete as specified and as directed. note: the punned down thickness shall only be measured m&l f
Sector: Defense