Description: PROVN OF BLACK TOP ROAD AT DRAS UNDER GE KARGIL Name of Work PROVN OF BLACK TOP ROAD AT DRAS UNDER GE KARGIL
Details: Surface dressing n exc 15 cm deep and getting out in hard/dence soil, complete all as specified and directed by Engineer-in-charge. Excavating over areas, n exc 1.5 m deep and getting out in hard/dence soil, complete all as specified and directed by Engineer-in-charge. Forming embankments including raising (or lowering) earth, spreading in layers n exc. 30 cm thick; watering, ramming/rolling and finishing to required size, shape, etc., n exc. 1.5m high from base, complete all as specified and directed by Engineer-in-charge. Removal of excavated material to a distance exceeding 1.5 Kilometre but not exceeding 5.00 Kilometre and depositing where directed, complete all as specified and directed by Eng in charge . 200 mm thick granular sub bases and light wearing surfaces with Shingle or gravel, spread, rolled and consolidated to gradient and camber as required, complete all as specified and directed by Engineer-in-charge. 150 mm thick ( Compacted thickness) WMM laid in two layers of 75mm
Sector: Defense