Details: taking down of existing tarfelt and cement plaster of any description and thickness on roof top including flashing and junction of parapet and cleaning existing roof top surface by brooming , wire brushing incl removing the debrish out complete all as specified and directed note for all items : the all items shall be operated/executed in repair in patches at various locations as directed and necessary scafolding if required shall deemed to included in the quoted rates demolition concrete of any description and in any position not otherwise specifically provided for complete all as specified and directed m&l for cement concrete type b0 (1:2:4) using 12.5mm size graded stone aggregate ) in roof padding complete all as specified and directed m&l for 15mm thick rendering on concrete surface on roof in cement plaster 1:4 finished even and fair without using extra cement by using wpc @ 3% of wt of cement content compl
Sector: Defense