Description: ADDN ALTN OF B AND C PLATOON BATHROOM AT IMTRAT AREA UNDER GE AF HASIMARA Nature of Work ADDN ALTN OF B AND C PLATOON BATHROOM AT IMTRAT AREA UNDER GE AF HASIMARA
Details: Demolition of Bricks work or stone/boulder masonary, built in cement mortar including all quoins, arches, pillars etc but excluding ashlar facings, dressed stonework and precast concrete aritcles, complete all as specified and directed. M&L forming jambs, etc. to openings (to foregoing item), including cutting, toothing and properly bonding into old work, also facing, jointing and pointing to match existing work, in CM (1:4), complete all as specified and directed. Excavation in trenches n.exc 1.5m wide and n.exc 1.5m depth and n.exc 10 Sqm on plan and getting out in hard soil, complete all as specified and directed. M & L for PCC (1:4:8) type D-2 ( Nominal mix) (using 40mm graded crushed stone aggregate) as in foundation, filling and similar work, complete all as specified and directed. M&L for for brickwork with fly ash bricks, straight or curved on plan exc 6m mean radius, built in CM (1:6), complete all as specified and directed. Dismantling floor, hearth or wall tiling including
Sector: Defense