Details: name of work renovation of hpu dismantling of existing masonry wall structure, false ceiling, etc., usinghydraulic excavator concrete breaker machine, diamond wheel wall sawcutter machine, electrically operated breaker machine, cutting of re-bars usinggrinder/gas cutter & removing of all debris generated. the dismantled itemmust be disposed to the nearby disposal yard/guest house.the rate shall include the hire charge of machineries, vehicles and tools required forthe work, gas cutting set, transportation of waste to disposal yard, labour chargesetc., to carryout complete work.8 m32providing and laying rcc m20 grade mix for lintel, sunshade, etc., with aminimum cement content of 360 kg/m3(opc) of concrete by using 20-12mmdowngraded stones, mechanically vibrated, consolidated, curing, includingusage of quality material as approved, cost, conveyance, lead, lift of allmaterials, labour, necessary reinforcement, shuttering/formwork etc.the rate shall include labour charges & cos
Sector: Mining