Details: dismantling reinforced cement concrete / plain cement concrete and disposing of debris upto to a lead of 2 km including loading, unloading and spreading as directed by engineer-in-charge etc., complete. earth work in excavation in all soils by mechanical means (hydraulic excavators) / manual means in foundations trenches or drains (not exceeding 1.5m in width or 10 sq.m on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. all as directed by engineer-in-charge. earth work in excavation by mechanical means (hydraulic excavators) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m, disposing earth to be levelled and neatly dressed for hard rock (blasting prohibited). all as directed by engineer-in-charge. filling with available excav
Sector: Power Sector