Description: Rearrangement of aluminium partitions in 28 and 48 seater workstations providing rain harvesting pit painting to DGM and GM chambers in Ist floor and other miscellaneous civil works in ITPC OU compound Hyderabad Name of Work Rearrangement of aluminium partitions in 28 48 seater workstations providing rain harvesting pit painting to DGM and GM chambers in Ist floor and other miscellaneous civil works in ITPC OU compound Hyderabad
Details: Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. In cement mortar Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. All kinds of soil Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil. Centering and shuttering including strutting, propping etc. and
Sector: Telecommunication