Details: 2.6.1.earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by engineer-in-charge. all kinds of soil 2.32 clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared 60.7.1 dry rubble masonry _ dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site 4.1.3 providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 4.1.8 providing and laying in position cement concrete of specified gra
Sector: Agri Marketing