Details: design, engineering, manufacturing, supply, instalation, commissioning of solar pv power plants with grid connectivity including 5-year warranty, labour for the civil works, fee for approval from the electrical inspectorate if any, solar meter, remote monitoring facility, insurance, gst and all other expenses deemed necessary for the proper implementation of the conditions and specification in-corporated in the tender.the entered cost is for the instalaltion of power plant in flat rcc roof and sloping roof which have accessibility and requires a maximum of 30m cabling at dc side and 50m cabling in ac side* 2.5% non-refundable license fee will be charged on the total contract value(total amount with taxes)** 18% gst will be applicable on the license fee 1kwp solar power plant 2kwp solar power plant 3kwp solar power plant 4kwp solar power plant 5kwp solar power plant
Sector: Renewable Energy