Details: a: deployment of 150 reef modules off the coast of fishing villages in arattupuzha, alappuzha 5.9.1 : centering and shuttering including strutting, etc. and removal of form for:foundations, footings, bases of columns, etc for mass concrete 5.1.2 : providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size 5.22.6 : steel reinforcement for r.c.c work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelthermo - mechanically treated bars of grade fe-500d or more od42916/2024_2025 : stucco plastering 12mm thick using hard blue granite chips of size 10mm and below over a<br>base of plastering with c.m 1:4 mix (1 cement : 4 coarse sand) 12mm thick for 10 sqm<br>including cost, conveyance etc complete<br> od42781/2024_2025
Sector: Infrastructure