Details: construction of well (8m dia) 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared 60.2.6:bailing out water using pump above 30hp and up to 40hp - bailing out water with engine and pump set above 30hp and up to 40hp, including conveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etc complete 60.2.3:bailing out water using pump above 5 hp and up to 10 hp-bailing out water with engine and pump set above 5hp and up to 10hp, including conveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etc complete 100.3.7.1:earthwork in open well excavation (above water) for wells of diameter above 6.0m and up to 9.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift up to 1.5m including neat banking
Sector: Irrigation