Description: Extension of Runway Balance Work Isolation Bay and other allied works etc at Dibrugarh Airport SH Construction of Security Compound wall in the land acquired from defense for runway extension at Dibrugarh Airport Name of Work Extension of Runway Balance Work Isolation Bay and other allied works etc at Dibrugarh Airport SH Construction of Security Compound wall in the land acquired from defense for runway extension at Dibrugarh Airport
Details: Dismantling the foundation after excavation, dismembering each element carefully and taking out and stacking all parts carefully numbered and bundled for a lead up to 2 Km, existing colour coated weld mesh fencing in defence area of height 2.6 with additional 1.00 m Concertina coils and 6 nos runner wires over hang demarketing defence area erected by Military engineers at site. The existing fencing consists of colour coated poles placed approximately 2.50 m centre to centre filled with specialised colour coated weld mesh with nut and bolt arrangements. The work includes dismembering each component like concertina runner wire, concertina coil, weld mesh and poles and stacking properly to re- at location shown by the Defence. The cost shall include all activities for excavation required, dismantling the concrete on which the poles are fixed, transportation and orderly stacking etc complete as per the direction of engineer in charge. Fixing and re erecting weld mesh fencing obt
Sector: Airport