Details: 11 kv line construction fitting and providing one strut using ht psc pole incl. digging & back filling pit. loading ht psc pole from the stacking place and unloading the same at work site (transport by vehicle). transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (running km). additional rate for excavation of one pit for ht pole/ht stay in laterite. fitting and erecting one ht psc pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. fitting one additional v cross arm in existing single pole incl. conveyance of materials. dismantling (without damage) one lt psc/rcc pole after disconnecting stays, strut etc. and stacking the same. transferring lt 3ph 4/5 wire oh line to newly erected ht/lt pole and refitting all items to the new pole. providing concrete muffing (0.45x
Sector: Power Sector