Details: road 3.15:scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by mechanical means <br> od153/2025-2026:construction of granular sub-base by using departmental material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at omc, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. grading-iv - for lower sub-base - mix in place method using departmental material 4.2.a.2:construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at omc, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. grading-iv - for lower sub-base - mix in place method 4.12:providing, laying, spreading and compacting graded stone aggregate to
Sector: Agriculture Misc