Details: uluvan padi road od218872/2024_2025 : [od from dar 2.28.1]surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift up to 1.5 m.<br>all kinds of soil od218873/2024_2025 : [od from dar 51.2.3 ] filling with quarry muck filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the cbr value of subgrade od226851/2024_2025 : providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4<br>course aggregate) laid to required and camber in panels (@ 3 m c/c) as required<br>including compaction, finishing and tamping etc .complete. max. size of course<br>aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per<br>specification<br> (i) nominal mix (1:2:4)<br>a)materials.: od derived from mord 75.8.1 s
Sector: Industries and Factories