Details: fitting and erecting one ht psc pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. loading ht psc pole from the stacking place and unloading the same at work site (transport by vehicle). transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. dismantling and reconnecting sph service connection from the oh line incl. lowering down the wp portion. dismantling and reconnecting 3ph service connection from the oh line incl. lowering down the wp portion. dismantling one ordinary street light/cfl/led fitting from existing pole and refitting the same on newly erected pole and reconnecting. dismantling (without damage) one km 11kv line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. dismantling (without damage) one lt psc/rcc pole after disconnecting stays, strut etc. and stacking the same. transferring lt sph 2/3 wire oh line to newly erected ht/lt pole
Sector: Power Sector