Details: rennovation of pond 50.2.3.1 pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 2.6.1 earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil 2.26.1 extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.all kinds of soil od2498/2024-2025 dismantling dr - dismantling clearing away and carefully stacking materials useful for reuse for any thickness of walls in dr masonry including disposal of debris within a distance of 150 m od2646/2024-2025 dry rubble masonry- dry rubble without concrete levelling course masonry with good qualityblasted rubble including packing to compactness to lines and level cost an
Sector: RDPR