Details: retaining wall 0.80 m height (60.60 rm) 2.6.1 earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposedearth to be levelled and neatly dressed.all kinds of soil od1092/2024-2025 dry rubble masonry- dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and level cost and conveyance of all materials labour charges etc complete as per direction of departmental officers at site. 5.9.1 centering and shuttering including strutting, etc. and removal of form for:foundations, footings, bases of columns, etc for mass concrete 5.22.6 steel reinforcement for r.c.c work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelthermo mechanically treated bars of grade fe-500d or more 5.1.2 provi
Sector: RDPR