Details: construction of concrete road from generator room to shed no.3 via tc hostel at mattupatty farm preparation of foundation for embankmentscarifying existing granular surface to a depth of 50 mm by manual means scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per technical specification clause 301.4. excavation in soil with dozer with lead upto 100 m excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. clearing grass and removal of clearing grass and removal of up to a distance of 30m outside the periphery of the area as per technical specification clause 201. by manual means filling with quarry muck filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, level
Sector: Livestock