Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead. cutting y angles at required height as per the direction of the departmental officer. demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in cement mortar random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with: cement mortar 1:6 (1 cement : 6 coarse sand) centering and shuttering including strutting, etc. and removal of form for
Sector: Power Sector