Details: labour fitting one additional 75x40mm, 1.8m channel cross arm in existing single pole incl. conveyance of materials. loading ht a type pole from the stacking place and unloading the same at work site (transport by vehicle). renewal of existing damaged/old 11kv psc/rcc dp with new a type dp in place and refitting of all items incl. conveyance (except poles). erecting one lt psc pole in position incl. digging & back filling pit. dismantling one transformer (upto and incl. 160kva) from existing structure to ground. dismantling one channel cross arm from existing dp structure, and bringing back to section store. dismantling (without damage) one km 11kv line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. dismantling (without damage) one lt psc/rcc pole after disconnecting stays, strut etc. and stacking the same. dismantling (without damage) one ht stay incl. back filling, and bringing back to section store. transporting poles by hired vehicle to a distance
Sector: Power Sector