Details: appendix i repair works dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. for thickness of tiles 10 mm to 25 mm demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge. nominal concrete 1:4:8 leaner mix ( including equivalent design mix) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level: 1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) providing and laying water proofing treatment in sunken portion of wcs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. this layer will be allowed to air cure for 4 hours. b) second layer of slurry of cement
Sector: Religious building